Industry Guidance Bulletins Bulletin No. 22-002: Interwell Spacing Requirements Bulletin No. 22-001: Updated Blow-Out Preventer Equipment (BOPE) Test Report Bulletin No. 21-004: Updated Surety Bond form and Notarized Documents Bulletin No. 21-003: Updating of Forms for Electronic Submission Bulletin No. 21-002A: Suspended Well Guidance Bulletin No. 21-001: No-Flow Test Guidance Bulletin No. 20-005: Notarized Documents Bulletin No. 20-004: Paperless Monthly Production, Injection, and Gas Disposition Reporting Bulletin No. 20-003: Due Date for Annual Reports Bulletin No. 20-002: Submitting Electronic Reports and Digital Data Bulletin No. 20-001: Initial Electronic Permitting Procedures Bulletin No. 17-01: Testing Procedure for New Casing Bulletin No. 16-01: Exploratory Well Pre-Permit to Drill Application Submittal Review Bulletin No. 15-01: Reporting Guidance Bulletin No. 13-02: Custody Transfer Meter Application Guidance Bulletin No. 13-01: Remedial Cementing for Surface Casing Bulletin No. 10-04: Safety Valve Systems Bulletin No. 10-003A: Reporting BOPE Use Bulletin No. 10-02B: Mechanical Integrity Testing Bulletin No. 10-01A: Test Witness Notification Bulletin No. 08-01: Gas Detection Alarms Bulletin No. 07-01: Kill Line Bulletin No. 06-05: Gas Disposition Reporting Requirements Bulletin No. 06-04: Subsurface Safety Valves Bulletin No. 06-03: VBR Testing Bulletin No. 06-02: Well Plugging Requirements Bulletin No. 06-01: BOPE Testing After Use Bulletin No. N/A: Multiphase Metering Systems